0.9m Telescope Control System Information


_______________________________________________________________________

This page gives details about the new Telescope Control System (TCS)
at the 0.9m, which was installed in April 2005 by DFM Engineering.
_______________________________________________________________________

DATES
_______________________________________________________________________

02 APR 2005	last night of old TCS at 0.9m

25 APR 2005	first night of new TCS at 0.9m
_______________________________________________________________________

GENERAL CAPABILITIES
_______________________________________________________________________

1. pointing now good to approximately 20"

2. minimal or no guiding required for exposures up to 5 minutes

3. the slew is much faster than for the previous TCS
_______________________________________________________________________

PROBLEMS
_______________________________________________________________________

The new TCS does not talk successfully with ARCON, which causes the
IRAF headers to have missing/incorrect information that should come
from the TCS.  The following fields cannot be trusted in the IRAF
headers:

	RA         several arcmin off
	DEC        several arcmin off
	EPOCH      total garbage
	ZD         0.0
	HA         incorrect
	ST         incorrect
	AIRMASS    total garbage
_______________________________________________________________________